Dry Density — Heavy Compaction Test
(Modified Proctor Test — IS 2720 Part 8)

Laboratory determination of the optimum moisture content (OMC) and maximum dry density (MDD) of soils using heavy (modified) Proctor compaction — for airport, runway, heavy industrial and expressway subgrade design.

IS 2720 Pt.8
Standard
±2%
Accuracy
3 Days
Report TAT
NABL
Accredited
NABL Accredited Lab · ISO/IEC 17025:2017
Digital Reports via Autovity QLMS
Pan-India · 7 Lab Locations
Est. 2009 · 20,000+ Projects

What is the Dry Density — Heavy Compaction Test?

The Modified Proctor Compaction Test (Heavy Compaction) determines the OMC and MDD under a higher compaction energy of 2700 kJ/m³ — 4.9kg rammer, 450mm drop, 5 layers, 25 blows per layer. This simulates the heavier compaction equipment used on high-specification projects and produces a higher MDD (denser compaction) and lower OMC than the Standard Proctor test.

Conducted as per IS 2720 Part 8, the Modified Proctor test is specified for airport runways (AAI), expressways, heavy industrial facilities and any project where compaction equipment produces energy equivalent to or exceeding the modified effort. The resulting MDD and OMC are used to specify field compaction requirements and verify compliance per IS 2720 Part 28.

Higher Compaction Energy
2700 kJ/m³ — 4.9kg rammer, 450mm drop, 5 layers, 25 blows per layer.
Higher MDD Than Standard Proctor
Modified Proctor MDD typically 5–10% higher than standard — more suitable for heavy projects.
5-Point Full Compaction Curve
Complete dry density vs water content curve with zero air voids line.
Airport & Expressway Specification
AAI, NHAI expressways and heavy industrial roads specify modified Proctor compaction.
NABL Certified Reports
All test and calibration results are backed by traceable measurements and standardized procedures.
Side-by-Side with Standard Proctor
Both tests offered together for complete compaction characterisation.

How the Dry Density — Heavy Compaction Test is Conducted

  • 1
    Sample Preparation
    Soil sieved through 20mm sieve. 5kg portions prepared at 5 different water contents spanning OMC.
  • 2
    Heavy Compaction
    Soil compacted in 1000ml mould in 5 equal layers, 25 blows per layer with 4.9kg rammer falling 450mm.
  • 3
    Water Content Measurement
    Representative sample from each specimen dried at 105°C for water content determination.
  • 4
    Dry Density Calculation
    Bulk density from mould mass and volume. Dry density = bulk density / (1 + w/100).
  • 5
    OMC, MDD & Report
    Compaction curve plotted. OMC and MDD read from peak. Zero air voids curve plotted. NABL report within 3 days.

Applicable Test Standards

Standard Title Scope Type
IS 2720 Part 8 Methods of Test for Soils — Determination of Water Content-Dry Density Relation (Heavy Compaction) Modified Proctor Indian Standard
IS 2720 Part 28 Methods of Test for Soils — Determination of Dry Density by Sand Replacement Field Density Reference Indian Standard
ASTM D1557 Standard Test Methods for Laboratory Compaction Characteristics of Soil — Modified Effort Modified Proctor ASTM
IRC 36 Recommended Practice for Construction of Earth Embankments for Road Works Highway Earthwork IRC

Where is the Dry Density — Heavy Compaction Test Used?

Airport runway and taxiway subgrade compaction per AAI specifications
NHAI expressway subgrade where modified Proctor compaction is specified
Heavy industrial facility floor and road subgrade compaction specification
Railway formation compaction per RDSO heavy compaction specification
Port and logistics park heavy-traffic road subgrade acceptance
Earth dam core compaction for high-specification hydraulic structures

Our Advantages

NABL Accredited ReportsLegally valid IS 2720 Part 8 certificates for airport, expressway and industrial projects.
5-Point Compaction CurveFull curve from wet to dry of optimum for accurate OMC/MDD.
Standard + Modified Proctor TogetherBoth IS 2720 Part 7 and Part 8 offered simultaneously for complete comparison.
Fast 3-Day ReportComplete modified Proctor results and NABL report within 3 working days.
Pan-India CoverageGeotechnical lab at all 7 NABL-accredited locations.
AAI Airport ComplianceReports formatted for AAI airport pavement subgrade requirements.
Get Started Today
Ready to request the Dry Density — Heavy Compaction Test?
Schedule a site visit or send samples — our team responds within 2 hours.